Samsung to invest 46 trillion won in Onyang HBM hub, new line due June 2028
Samsung Electronics plans to turn its Onyang Campus in Asan, South Korea, into a hub for HBM[1], the high-bandwidth memory used in AI chips. The company will invest 46 trillion won in stages to build five HBM production lines. Of this, 6 trillion won is for factory construction and 40 trillion won for advanced equipment.
On 12 November, Chairman Lee Jae-yong and President Lee Jae-myung attended the groundbreaking ceremony for the new fifth line, part of the Chungcheong Mega Project. The new line is a three-story building with a cleanroom[2] of about 31,000 m². Operation is targeted for June 2028. After completion, the campus floor area will grow from 270,000 m² to 420,000 m², about 1.6 times, and direct hiring is expected at about 700 people.
The campus has operated since late 1991 as a back-end[3] site for chip assembly and testing. Lee said HBM packaging will be added to these existing capabilities. The President pledged stronger government support to resolve production difficulties faced by companies.
Read the original ddaily.co.kr
Sources
-
KRDigital Daily KO
이재용 "또 한 번의 도약"…삼성전자, 온양 HBM 거점 구축에 46조원 투자



